House extension in London

Side-Return, Rear or Wraparound Extension: Which Suits Your London Home?

By the Golbik GBS team · Blog

For many London families, extending is the best way to gain a large kitchen and living space without moving. The three most common options for terraced and semi-detached houses are the side-return, the rear and the wraparound extension. This guide compares them so you can decide which house extension makes most sense for your home and budget.

Key takeaways

  • Side-return extensions fill the narrow passage beside a terrace’s rear outrigger and widen the kitchen.
  • Rear extensions push the back of the house into the garden and can often use permitted development.
  • Wraparound extensions combine both and add the most ground-floor space, but usually need planning permission.
  • Party Wall notices are almost always needed for extensions to terraced and semi-detached houses.
  • If a public sewer runs under the extension, a build-over agreement with Thames Water may be required.

Extension Types Compared

TypeWhat it doesBest forPlanning
Side-returnFills the side passage next to the rear outriggerVictorian and Edwardian terracesUsually needs planning permission
RearExtends the back of the house into the gardenMost housesOften permitted development or prior approval
WraparoundCombines side-return and rear in an L shapeMaximum ground-floor spaceAlmost always needs planning permission
Two-storey rearAdds space on the ground and first floorLarger plots, detached housesUsually needs planning permission

Side-return extension

Most Victorian and Edwardian terraces have a narrow outrigger at the back with an awkward passage beside it. Infilling that passage turns a narrow galley kitchen into a wide, bright kitchen-diner. Glazed or sloping roofs with roof lights are often used to bring light into the middle of the house.

Rear extension

A rear extension pushes the back wall into the garden. It is simpler in shape, often possible under permitted development or prior approval, and ideal for creating a family room that opens onto the garden with wide sliding or bi-fold doors.

Wraparound extension

A wraparound combines a side-return with a rear extension. It gives the largest open-plan space and is a popular choice for growing families, but it is the most complex to design and build and usually needs a planning application.

Permitted Development and Prior Approval

  • Standard rules: a single-storey rear extension of up to 3 metres for terraced and semi-detached houses and 4 metres for detached houses, with height limits.
  • Prior approval: larger single-storey rear extensions of up to 6 or 8 metres, after the council has consulted the neighbours.
  • Side extensions: limited to single storey, no wider than half the width of the house, and not permitted in conservation areas.
  • Materials: must be similar in appearance to the existing house.
  • Not available for flats, and removed in some areas by Article 4 directions.

Conservation areas and local policies vary across London. Our area guides cover Clapham, Fulham, Chelsea, Hammersmith, Dulwich and Mitcham.

Party Walls, Sewers and Building Regulations

  • Party Wall Act: notices must be served on neighbours for work to a shared wall, building on the boundary or excavating close to their foundations, usually one to two months before work.
  • Build-over agreement: needed from the water company, usually Thames Water, if the extension is built over or close to a public sewer.
  • Building Regulations: cover foundations, structure and steel beams, drainage, insulation, glazing, ventilation and fire safety.
  • Structural design: opening up the back of the house normally requires steel beams designed by a structural engineer.

Making the Most of the New Space

Most extensions are built around a new kitchen, so it pays to design both together. See our kitchen renovation service, and plan the electrical layout and plumbing and underfloor heating early, before the floor slab is laid.

If you also need extra bedrooms, an extension is often combined with a loft conversion, or with a full refurbishment of the rest of the house.

Frequently Asked Questions

Do I need planning permission for a side-return extension?

Usually, yes. A side extension that also extends beyond the rear wall, or that wraps around, generally falls outside permitted development. A single-storey side extension on its own can sometimes be permitted development, but not in conservation areas.

How far can I extend without planning permission?

Under standard permitted development, a single-storey rear extension can extend up to 3 metres on a terraced or semi-detached house and 4 metres on a detached house. Through the prior approval process, this can be up to 6 and 8 metres respectively, subject to neighbour consultation. These rights do not apply to flats.

What is a build-over agreement?

If your extension will be built over or near a public sewer, the water company needs to approve it before work starts. In most of London this is Thames Water. It protects access to the sewer and avoids costly problems when you sell the house.

Can I live at home while an extension is built?

Many people do, especially for rear extensions where the house can be sealed off from the works. Expect a period without a working kitchen when the new space is joined to the existing house.